The NREP is originally targeted in the direction of the addition of RE-based capability for power generation. This system for non-power programs shall be incorporated subsequently.The NREP sets out indicative interim targets with the supply of renewable energy within the timeframe of 2011 to 2030. Conference the massive targets upto 2020 will be di